Menu

 

A. Capital Justification
1. New build to specifications
2. Used or rebuild equipment project
3. Addition to existing equipment
4. Provide engineering specifications, documents, and drawings, which can be used for bidding equipment and components including installation into a facility.
 
B. Project Tasks
1. Secure equipment with build lead time within project timelines.
2. Building construction/remodel phase before machinery can be installed.
3. Develop requirements and define all components, control levels, HMI, (wonder Ware, Cimplicity, software), with PLC-PC needs for installation. Define at least two levels for control. Basic and advanced levels to allow customers to select which level best meets product expectations.
 
C. System Integration PLC PC
1. Identify project scope to reveal all required controls which offers the customer the best systems to achieve their production experience.
2. Design systems with CAD layout of all interconnection panels, drive components, and all safety requirement devices.
3. Installation
 
    D. We offer this system integration as a separate service from Process Inc. without the equipment installation. This could be done as a retrofit to existing equipment to meet your new production expectations. We can help you with an entire project or a portion of it to meet you integration needs.