| 1. New build to specifications |
|
| 2. Used or rebuild equipment project |
|
| 3. Addition to existing equipment |
|
| 4. Provide engineering specifications,
documents, and drawings, which can be used for bidding
equipment and components including installation into a
facility. |
|
| |
|
|
| 1. Secure equipment with build lead time
within project timelines. |
|
| 2. Building construction/remodel phase
before machinery can be installed. |
|
| 3. Develop requirements and define all
components, control levels, HMI, (wonder Ware, Cimplicity,
software), with PLC-PC needs for installation. Define
at least two levels for control. Basic and advanced levels
to allow customers to select which level best meets product
expectations. |
|
| |
| C. System Integration PLC PC |
|
| 1. Identify project scope to reveal all
required controls which offers the customer the best systems
to achieve their production experience. |
|
| 2. Design systems with CAD
layout of all interconnection panels, drive components,
and all safety requirement devices. |
|
|
|
| |
| D. We offer this
system integration as a separate service from Process
Inc. without the equipment installation. This could be
done as a retrofit to existing equipment to meet your
new production expectations. We can help you with an entire
project or a portion of it to meet you integration needs. |
|